ISO 27566-3 Revision Checker
ISO/IEC DIS 27566-3stage 40.20ballot closes 4 December 2026planning date 14 September 2027

All 17 analysis units · Scope the comparison

P3-01

Name the object you are comparing

Before any test, state whether the object is a whole age assurance system, a single component, or a component inside a live system. Give each object a version, a supplier and a date, and keep the boundary fixed for the whole comparison.

Group Scope the comparisonPublic source WG 5 N3928, clause 4.1.1Evidence 3 items

What the unit asks

The working draft adopts the ISO/IEC 29155 benchmarking model: the thing being compared is how a system performs, not the company that sells it. That distinction only holds if the boundary is written down. A face-estimation component tested on a bench is not the same object as the same component inside a document-checking workflow, and the two results cannot be pooled.

What good practice looks like

Write one sentence per object, name the component chain and mark what is excluded. Version the sentence. When a supplier changes a model, a threshold or a document list, that is a new object and a new comparison.

Evidence an assessor asks for

ArtefactWhy it matters
An object register with one row per system or component, its version, its supplier and the date the version was confirmed.It is the only defence against comparing unlike things and calling the difference a result.
A boundary diagram showing the components, the processing sub-system and the relying party interface.It shows what the test covers and what it leaves outside.
A change log for the comparison period.A model or threshold change mid-test invalidates the comparison, and the log is how you know.

What a good answer sounds like

A good answer to P3-01 names An object register with one row per system or component, its version, its supplier and the date the version wa, dates it, and says what it does not cover. A policy or a promise is not an answer. If P3-01 has no artefact, the row is not met and the absence is the finding.

Where comparisons commonly fail

  • The comparison mixes a component test with a system test and reports one number.
  • The version of the system tested is not recorded, so the result cannot be tied to the service that is live now.
  • The relying party interface is left outside the boundary, although it decides what data is disclosed.

Questions to put to the supplier

  1. What exactly is the object, and what is outside it?
  2. If the supplier ships a new model tomorrow, is this comparison still about the same thing?

How this is used in the kit

P3-01 becomes one row of the comparison register, with an owner, a status and the evidence named above. A status of met asks for the artefact and its date, and the free check uses the same row as an evidence question, so the page and the register share one vocabulary.

Source for this page

Retrieved 2026-10-21. P3-01 is our statement of WG 5 N3928, clause 4.1.1; the DIS body is not public, so no DIS clause number is claimed.